gallery / 14 post/s found

KOLEJ MATRIKULASI KELANTAN.

Project Title : Pemasangan Sistem Teknologi Maklumat & Komunikasi (ICT) Untuk Kolej Matrikulasi Kelantan.
Contract No : JKR/IP/CKP/12/2013(2013-11)
Project Values : RM16,827,759.91
Scope of Work : Total Hardware and Software Solution, To supply, install, testing and commissioning
Hardware

  • Fiber Backbone Cabling – 5.5 km 8 core singlemode
  • Data Center Implementation  consist of In-Row Cooling System, Vesda  Systems, FSS and CRAC Systems, EMS
  • Unified Communication – Network Active Equipment
  • Storage & Backup Solution – 120 TB
  • PC & Notebook – 570 units Desktop, 100 Laptop
  • Printer & Scanner – 144 units printer, 38 scanner
  • Servers – 1 Blade Server, Total of 18 server
  • Biometric, Card Access and Entry Gate System
  • Language Lab Solution

Software:

To develop , install , testing, commissioning and training of eMatris:

  • eMatris is built as a centralized web based portal for all Kolej Matrikulasi in Malaysia which consists modules as below:
Duration : 8 weeks

 

Wisma FHSB

PABX & IP Telephony Solution

PBX stands for Private Branch Exchange, which is a private telephone network used within a company or organization. The users of the PBX phone system can communicate within their company or organization and the outside world, using different communication channels like Voice over IP, ISDN or analog. A PBX also allows you to have more phones than physical phone lines (PTSN) and allows free calls between users. It also provides features like transfers, voicemail, call recording, interactive voice menus (IVRs) and ACD call queues.

PBX phone systems are available as Hosted or Virtual solutions (sometimes also called Centrix), and as inhouse solutions to be used on your own hardware.

PBX phone systems are usually much more flexible than proprietary systems, as they are using open standards and interfaces. Modern PBX phone systems are based on standard hardware, which is cheaper and can easier be replaced than a closed systems.
 

What we do?

  • Integrates voice and data solutions for businesses of any size
  • Advanced features such as automated call distribution, auto attendant, and sophisticated voice messaging systems
  • Unified Communication Systems (UCS)

Storage & Virtualization Solution

Data visualization is a general term that describes any effort to help users understand the significance of data by placing it in a visual context. Patterns, trends and correlations that might go undetected in text-based data can be exposed and recognized easier with data visualization software.
 

What we do?

  • Virtualization design and implementation
  • SAN Switch Technologies
  • Storage Product to increase cloud storage technology

Backup & Recovery Solution

In general, backup and recovery refers to the various strategies and procedures involved in protecting database against data loss and reconstructing the database after any data loss. Because data is the heart of the enterprise, it’s crucial for us to protect it. And to protect our organization’s data, we need to implement a data backup and recovery plan. Backing up files may protect against accidental loss of user data, database corruption, hardware failures, and even natural disasters. We have to make sure that backups are done and the backup tapes are stored in a secure location.

A backup is a copy of data from your database that can be used to reconstruct loss data. Backups are be divided into physical backups and logical backups. Physical backups are backups of the physical files used in storing and recovering your database, such as datafiles, control files, and archived redo logs. Ultimately, every physical backup is a copy of files storing database information to some other location, whether on disk or some offline storage such as tape. Logical backups contain logical data (for example, tables or stored procedures) exported from a database with an Oracle export utility and stored in a binary file, for later re-importing into a database using the corresponding Oracle import utility.

Data recovery is the process of salvaging and handling the data through the data from damaged, failed, corrupted, or inaccessible secondary storage media when it cannot be accessed normally. Often the data are being salvaged from storage media such as internal or external hard disk drives, solid-state drives (SSD), USB flash drive, storage tapes, CDs, DVDs, RAID, and other electronics
 

What we do?

  • Backup Multi-tiered architectural design & solutions with maintenance.
  • Security, product and administration backup setting.
  • Backup network and performance configuration setting.
  • Backup enterprise multi-tiered, multi-client data centre environments.

KOLEJ MATRIKULASI KELANTAN.

Project Title : Pemasangan Sistem Teknologi Maklumat & Komunikasi (ICT) Untuk Kolej Matrikulasi Kelantan.
Contract No : JKR/IP/CKP/12/2013(2013-11)
Project Values : RM16,827,759.91
Scope of Work : Total Hardware and Software Solution, To supply, install, testing and commissioning
Hardware

  • Fiber Backbone Cabling – 5.5 km 8 core singlemode
  • Data Center Implementation  consist of In-Row Cooling System, Vesda  Systems, FSS and CRAC Systems, EMS
  • Unified Communication – Network Active Equipment
  • Storage & Backup Solution – 120 TB
  • PC & Notebook – 570 units Desktop, 100 Laptop
  • Printer & Scanner – 144 units printer, 38 scanner
  • Servers – 1 Blade Server, Total of 18 server
  • Biometric, Card Access and Entry Gate System
  • Language Lab Solution

Software:

To develop , install , testing, commissioning and training of eMatris:

  • eMatris is built as a centralized web based portal for all Kolej Matrikulasi in Malaysia which consists modules as below:
Duration : 8 weeks

 

UNIVERSITI SULTAN ZAINAL ABIDIN (UniSZA).

Project Title : Kerja-kerja Membekal, Menghantar, Memasang, Mengkonfigurasi, Menguji Dan Mentauliah Kemudahan Sistem Rangkaian Tanpa Wayar (Wifi Hotspot) Di Bangunan Fakuliti Informatik Dan Komputeran (Fik) Dan Kolej Kediaman Pelajar, Universiti Sultan Zainal Abidin (UniSZA), Kampus Tembila, Besut, Terengganu Darul Iman
Contract No : UniSZA.B/2/KP6/756-2 Jld.7 (2013-11)
Project Values : RM470,450.00
Scope of Work : To supply, install, testing and commissioning
  • WIFI Hotspot
  • 150 units Wireless Indoor AP
  • 50 units Wireless Outdoor AP
Duration : 10 weeks

 

INSTITUT PENDIDIKAN GURU.

Project Title : Pemasangan Sistem Teknologi Maklumat & Komunikasi (ICT) untuk Ubah Suai dan Naik Taraf serta Peralatan bagi 13 Makmal Bahasa seluruh Malaysia.
Contract No : JKR/IP/CKE/90/2012
Project Values : RM6,838,623.00
Scope of Work : To supply, install, testing and commissioning
  • 325 units Desktop and 26 units Colour Laser jet Printer
  • 35 units 10G Access Switches and 13 1U Server
  • 400 points of Data Structured Cabling
  • 408 units Indoor and Outdoor Fiber Termination
  • 1300 units Software with the Full Customization of Language and Learning Software.
  • 15 units Interactive Board c/w short throw Projector
  • Card Access Systems with the integration of existing IPG systems
  • 600 units of portable UPS and 30 Rackmount UPS
  • Office Automation System for each PLGDP
Duration : 8 weeks

 

BANK PEMBANGUNAN ISLAM.

Project Title : Implementation IT Server And Cabling Work For Islamic Corporation For The Development of The Private Sector (ICD)
Contract No : ICD/IT/09/2013
Project Values : RM135,000.00
Scope of Work : To supply, install, testing and commissioning
  • 8 core 50/125 µm Multimode Enhanced OM3 indoor fibre optics cable
  • 60A Distribution Board
  • UTP Cat 6 (EIA/TIA) factory terminated patch cords c/w RJ45 connectors
  • Network Active Equipments
Duration : 10 weeks

 

INSTITUT PENDIDIKAN GURU, BANDAR ENSTEK NILAI.

Project Title : Membekal, Menghantar, Memasang Dan Mengujilari Peralatan Untuk Institut Pendidikan Guru Malaysia, Bandar Pendidikan Enstek, Nilai, Negeri Sembilan.
Contract No : KPM/IPGM 7/2012
Project Values : RM312,200.00
Scope of Work : To supply, install, testing and commissioning
  • 3 units Interactive Projector
  • 4 units Electro Magnetic Interactive Board
  • 4 units Portable Interactive Board
  • 24 units Tablet PC
  • 22 units Visualizer
  • 2 units Plotter
  • 379 units Analog Single Line Telephone with Caller ID LCD
  • 8 units of All In One Touchscreen Computer
Duration : 8 Months